05 / Traffic impact studies (TIA/TIS)

Traffic impact studies (TIA/TIS), scoped with the reviewer

A traffic impact study (TIS), also called a traffic impact assessment (TIA), shows whether the network can absorb the traffic a development, facility or construction programme will add. We prepare them in Riyadh, across Saudi Arabia and in Qatar. Where the network cannot cope, the study sets out what must change. We scope it with the reviewer, collect the counts, build the models, test the mitigation and answer comments through to approval.

Traffic impact studies (TIA/TIS), scoped with the reviewer - TCM project photograph
TCM / IN THE FIELDSAUDI ARABIA & QATAR
Approving authorityAmanah, RCRC, Royal Commissions, MOT; Qatar MOT and Ashghal
ToolsSynchro, SIDRA, PTV VISUM, PTV VISSIM
DeliverablesScoping note, report, LOS tables, model files, mitigation
Turnaround3 to 5 weeks, including counts
When you need it

Who approves the study

01

Riyadh

Developments need a TIS approved by either RCRC or the Riyadh Amanah. Diriyah and Qiddiya review schemes on their programmes.

02

Rest of Saudi Arabia

The Amanah or municipality approves development studies; MOT reviews access to national roads; the Royal Commissions for Jubail and Yanbu apply their own rules.

03

Industrial and giga-projects

Aramco, NEOM and Qiddiya require studies for new facilities, gates and construction traffic, including shutdown workforce movements.

04

Qatar

Studies follow the MOT Guidelines and Procedures for Transportation Studies. Ashghal reviews impacts on its network and construction-stage diversions.

What you receive

A study written for the reviewer

  • Scoping note agreed with the reviewer: study area, junctions, horizon years and scenarios
  • Traffic counts, or review of your existing data
  • Trip generation, distribution and assignment for each horizon year
  • Junction and link capacity analysis with level of service (LOS) tables
  • Microsimulation where the network or the reviewer calls for it
  • Mitigation proposals with concept drawings, phasing, parking and access review
  • Final report, model files and responses to comments until approval
Traffic impact study (TIS) area plan for the SASREF expansion in Jubail Industrial City
Synchro junction capacity output with level of service (LOS) for a traffic impact study in Saudi Arabia
How we deliver

From scope to approval

  1. 01

    Scoping

    Study area, scenarios and method agreed before any data is collected.

  2. 02

    Data

    Counts, observations, development data and collision records.

  3. 03

    Modelling

    Synchro or SIDRA, VISUM networks, VISSIM where needed.

  4. 04

    Mitigation

    Junction, access and signal changes tested to the target LOS.

  5. 05

    Report

    Every assumption stated for the reviewer.

  6. 06

    Approval

    Comments answered and review meetings attended.

3 to 5 weeksTypical TIS, including counts
1 to 2 weeksConstruction-phase or access-only study
5 daysResponses to reviewer comments
Good questions. Clear answers.

Traffic impact study questions

Something else? Speak with an engineer.

WhatsApp Riyadh
What is the difference between a TIA and a TIS?

The terms describe the same type of study and authorities use them interchangeably. Some reserve TIA for a shorter assessment and TIS for the full study with modelling. The reviewer's terms of reference set the scope, not the title.

When is a traffic impact study required in Saudi Arabia?

When a development, facility or construction programme will add traffic that could affect the surrounding network. The Amanah, RCRC, the Royal Commissions or the project owner set the thresholds and ask for a study at the permit stage.

Who approves a traffic impact study in Riyadh?

The Riyadh Amanah or the RCRC approves studies for developments, depending on the project location. Diriyah and Qiddiya review studies that affect their programmes.

Do we need new traffic counts?

Usually yes. Reviewers expect recent counts taken in a normal traffic period. We use your existing data if the reviewer accepts it.

How long does a traffic impact study take?

A typical TIS takes 3 to 5 weeks from scope agreement, including counts. A construction-phase or access-only study with existing data takes 1 to 2 weeks.

Can you assess construction workforce traffic for a shutdown?

Yes. For Aramco's Jazan refinery shutdown we modelled 20,000 additional workforce movements and presented the results to the Board in a 3D video.

Start a conversation

Ready to move your project forward?

Send the site location and your programme. We come back with scope, price and earliest start, within one working day.

One engineer.
One accountable contact.

Request a proposal

Fields marked * are required.

0 / 2,000

Your request is submitted securely. An engineer will reply within one working day.

Request a proposal
Riyadh · Doha

Choose your local team

RiyadhSaudi Arabia+966 50 306 4427DohaQatar+974 7043 1546