Case study / Jazan / Aramco

Jazan Refinery shutdown traffic impact study

Aramco asked TCM to show whether the roads and gates around the Jazan Refinery could carry the workforce for a major turnaround, and what had to change if they could not. We counted the network, built the model and presented the answer to the Board in 3D video.

Jazan Refinery shutdown traffic impact study - TCM project photograph
TCM / CONNECTED EXPERTISESAUDI ARABIA & QATAR
ClientAramco
LocationJazan Refinery, Saudi Arabia
ScopeTraffic counts, TIS, macro modelling and 3D video
20,000additional workforce movements assessed
One view.Study and 3D video presented to Aramco’s Board of Directors
The challenge

Thousands of extra workers, short peaks, a network sized for normal days

A refinery turnaround brings thousands of contractor staff to site for a few weeks. Shift changes concentrate bus and car arrivals into short peaks at the gates, on a road network sized for normal operations.

Aramco needed evidence, before the shutdown started, that the network and the gates could take 20,000 additional workforce movements, and a clear picture of what to change if they could not.

How we deliver

Count, model, test, show

  1. 01

    Count

    Traffic counting surveys on the roads and junctions serving the refinery and its gates.

  2. 02

    Model

    A macro-level model of the network, loaded with normal operations plus the shutdown workforce.

  3. 03

    Test

    Scenarios for shift times, bus and car splits and gate allocation, compared on delay and queues.

  4. 04

    Visualise

    A 3D video of the critical periods, built from the model results.

  5. 05

    Present

    The study and the video presented directly to Aramco's Board of Directors.

What we delivered

Five outputs, one decision

  • Traffic counting surveys and validated data for the study network
  • Traffic impact study report with scenario results for each shutdown period
  • Macro-level traffic model of the refinery road network
  • 3D video simulation of the critical periods, with stills for reports
  • Board presentation material
Start a conversation

Planning a shutdown or large event?

Send the site location and your programme. We come back with scope, price and earliest start, within one working day.

One engineer.
One accountable contact.

Request a proposal

Fields marked * are required.

0 / 2,000

Your request is submitted securely. An engineer will reply within one working day.

Request a proposal
Riyadh · Doha

Choose your local team

RiyadhSaudi Arabia+966 50 306 4427DohaQatar+974 7043 1546