Mainline widening
Widening and realignment of the Dirab Road mainline.
The Royal Commission for Riyadh City (RCRC) is upgrading Dirab Road, a primary north-south arterial in south-west Riyadh that carries commuter traffic and heavy freight between industrial areas and the wider network. TCM delivered the counts, the traffic impact study and models, the traffic management plans and their approval, and the traffic management on site.

Corridor figures published by RCRC.
Dirab Road carries daily commuter traffic and a large share of heavy vehicles moving between the industrial areas of south-west Riyadh and the metropolitan network.
The scheme widens and realigns the mainline, builds grade-separated interchanges at Al-Fawaz and Al-Hawia, adds elevated U-turns and upgrades the service roads and accesses. Every phase had to keep both traffic streams moving, pass RCRC review and keep crews safe beside live lanes.
Each element changed the traffic management: new phases, new diversions and new approvals.
Widening and realignment of the Dirab Road mainline.
Grade-separated interchanges at Al-Fawaz and Al-Hawia, with their ramps and bridges.
New elevated U-turn facilities along the corridor.
Service road upgrades and rationalisation of accesses.
ITS, lighting, drainage and road safety works.
ATC link counts and video TMCs at the corridor junctions to set the base year.
A comprehensive traffic impact study of the corridor, the construction phases and the diversions.
Synchro junction analysis and VISSIM microsimulation of each phase, shown in 3D.
Phased TMP and TDP/TTCP drawings for the mainline, interchange, U-turn and service road works.
Submission to RCRC and responses to review comments through to approval.
Traffic management installed, inspected and maintained on site by our own team.
Send the site location and your programme. We come back with scope, price and earliest start, within one working day.
One engineer.
One accountable contact.