Saudi Arabia
Every closure on a public road uses devices that meet the Saudi Highway Code and the approved TMP/TTCP. RIPC, MOT and RCRC inspectors check sizes, sheeting, spacing and tapers.
We supply, rent, install and maintain traffic control devices and traffic safety equipment in Saudi Arabia and Qatar: signs, cones, drums, water-filled barriers, arrow boards, VMS and crash cushions, installed to the approved TDP. We inspect and maintain the layout for the duration of the works, remove it at the end, and install vehicle restraint systems.

Every closure on a public road uses devices that meet the Saudi Highway Code and the approved TMP/TTCP. RIPC, MOT and RCRC inspectors check sizes, sheeting, spacing and tapers.
Works on RCRC programme roads follow the RCRC Temporary Traffic Management Manual.
Devices comply with the Qatar Traffic Control Manual and the Ashghal Work Zone Traffic Management Guide, checked against the approved TDP.
Crash cushions and vehicle restraint systems at gore areas, bridge piers, toll plazas and fixed hazards, installed to the tested configuration.
Temporary regulatory, warning and direction signs, frames and sandbags.
Cones, drums, delineators, barricades and lane separators.
Water-filled and concrete barriers for longer-term closures.
Trailer-mounted arrow boards and variable message signs.
Warning lights, temporary lighting, stop/go and portable signals.
Crash cushions and vehicle restraint systems, surveyed, supplied and installed.
Device quantities taken off the approved TDP for each phase.
Devices loaded and checked against the schedule at the yard.
In the order the standard requires, with TMA protection where needed.
Every shift and every night, with defects recorded.
Damaged or displaced devices replaced the same shift.
In reverse order; the road handed back clean.
Something else? Speak with an engineer.
WhatsApp RiyadhTCM rents and supplies cones, drums, water-filled barriers, signs, arrow boards and crash cushions from stock held in Riyadh, installed to your approved TDP and maintained for the duration of the works.
Both. Most contractors rent devices for the duration of the works with installation and maintenance included. We also sell devices and supply permanent road safety furniture.
Yes. We install to the approved drawing, whoever prepared it. If it cannot be built as shown, we tell you before installation.
At every shift change and once at night for visibility, with a written log. Damaged or displaced devices are replaced in the same shift.
The Saudi Highway Code and the RCRC Temporary Traffic Management Manual in Saudi Arabia, and the Qatar Traffic Control Manual in Qatar.
Yes. We survey the site, supply the system and install it to the manufacturer's tested configuration at gore areas, bridge piers, toll plazas and other fixed hazards.
Send the site location and your programme. We come back with scope, price and earliest start, within one working day.
One engineer.
One accountable contact.