RIPC work permits require a TMP and TTCP prepared to the RIPC Infrastructure Projects Code. RCRC, Diriyah and Qiddiya review works on their programmes.
The traffic management plan (TMP) sets out how the works keep road users, pedestrians and the workforce safe. We prepare TMPs and TDP/TTCP drawings for RIPC permits in Riyadh, for MOT and municipal roads across Saudi Arabia, and for Ashghal approval in Qatar. The traffic diversion plan (TDP), called the TTCP in Riyadh, is the drawing set behind it: closures, tapers, buffers, signs, devices, detours and phasing.

We prepare the plan, submit it and answer reviewer comments until it is approved, then keep it current as the works move. We also prepare TTCPs for routine maintenance, inspections and emergency works by O&M and facility management contractors, including Riyadh Metro O&M.
RIPC work permits require a TMP and TTCP prepared to the RIPC Infrastructure Projects Code. RCRC, Diriyah and Qiddiya review works on their programmes.
Plans follow the Saudi Highway Code and are approved by the road owner: MOT, the Roads General Authority or the municipality, with traffic police coordination.
Aramco, Royal Commission and NEOM sites add their own permit-to-work and traffic rules on top of the SHC.
TDPs are prepared to the Ashghal Work Zone Traffic Management Guide and QTCM and go through Ashghal's TDP approval, with MoI Traffic Department coordination.
Lanes, accesses, existing signs, programme and working hours recorded.
TMP and TDP/TTCP drafted for each phase to the governing standard.
Our supervisors confirm each layout can be installed on a live road at night.
Submitted to Contractor, the road owner or Ashghal; comments answered to approval.
Optional: our crews install, protect with TMAs and log inspections.
Drawings updated as the works or the authority's conditions change.
Authority review periods vary and are outside our control. We track each submission and tell you where it stands.
Something else? Speak with an engineer.
WhatsApp RiyadhThe TMP is the overall plan: objectives, phasing, risks, stakeholders, emergency access and monitoring. The TDP, called a TTCP in Riyadh, is the set of drawings showing where each sign, cone, barrier and taper goes in each phase. Most authorities want both.
Infrastructure works in the Riyadh region are permitted through the Riyadh Infrastructure Projects Center (RIPC), which requires a traffic management plan and a temporary traffic control plan with the permit application.
The Saudi Highway Code requirements for work zones and traffic control devices, plus the RIPC Infrastructure Projects Code in Riyadh and any project-owner rules, such as Aramco or RCRC requirements.
A single-closure TDP takes 2 to 3 working days once we have the site survey and programme. A multi-phase corridor TMP takes 1 to 2 weeks.
A temporary traffic control plan (TTCP) is the drawing set RIPC requires with a work permit in Riyadh. It shows each closure, taper, sign and device for every phase. Elsewhere it is usually called a traffic diversion plan (TDP).
Yes. We supply the devices, install and maintain the layout, and provide TMA and IPV protection with our own crews.
Yes. Our Doha team prepares TDPs to the Ashghal Work Zone Traffic Management Guide and the Qatar Traffic Control Manual and manages the submission through to approval.
Send the site location and your programme. We come back with scope, price and earliest start, within one working day.