01 / Traffic management plans (TMP/TDP)

Traffic management plans and diversion plans (TMP/TDP), designed to approval

The traffic management plan (TMP) sets out how the works keep road users, pedestrians and the workforce safe. We prepare TMPs and TDP/TTCP drawings for RIPC permits in Riyadh, for MOT and municipal roads across Saudi Arabia, and for Ashghal approval in Qatar. The traffic diversion plan (TDP), called the TTCP in Riyadh, is the drawing set behind it: closures, tapers, buffers, signs, devices, detours and phasing.

Traffic management plans and diversion plans (TMP/TDP), designed to approval - TCM project photograph
TCM / IN THE FIELDSAUDI ARABIA & QATAR
When you need it

Any work on a public road needs an approved plan first

We prepare the plan, submit it and answer reviewer comments until it is approved, then keep it current as the works move. We also prepare TTCPs for routine maintenance, inspections and emergency works by O&M and facility management contractors, including Riyadh Metro O&M.

01

Riyadh region

RIPC work permits require a TMP and TTCP prepared to the RIPC Infrastructure Projects Code. RCRC, Diriyah and Qiddiya review works on their programmes.

02

Rest of Saudi Arabia

Plans follow the Saudi Highway Code and are approved by the road owner: MOT, the Roads General Authority or the municipality, with traffic police coordination.

03

Industrial and giga-project sites

Aramco, Royal Commission and NEOM sites add their own permit-to-work and traffic rules on top of the SHC.

04

Qatar

TDPs are prepared to the Ashghal Work Zone Traffic Management Guide and QTCM and go through Ashghal's TDP approval, with MoI Traffic Department coordination.

What you receive

Drawings that get approved and can be built at night

  • TMP report: scope, phasing, risk assessment, method statement, emergency access and contingency
  • TDP/TTCP drawings in AutoCAD and PDF for each phase, with sign and device schedules
  • Detour route review and, where the reviewer asks, capacity and queue checks
  • Submission to the authority and responses to comments until approval
  • Revisions when the programme or site conditions change
  • Optional: installation, maintenance and removal by TCM crews, with TMA protection
Corridor traffic management plan (TMP) drawing with lane closure layouts on an aerial base in Riyadh
TTCP drawing prepared for an RIPC work permit in Riyadh, with sign layouts for each phase
How we deliver

From site walk to approved drawing

  1. 01

    Site visit

    Lanes, accesses, existing signs, programme and working hours recorded.

  2. 02

    Design

    TMP and TDP/TTCP drafted for each phase to the governing standard.

  3. 03

    Buildability check

    Our supervisors confirm each layout can be installed on a live road at night.

  4. 04

    Submission

    Submitted to Contractor, the road owner or Ashghal; comments answered to approval.

  5. 05

    Implementation

    Optional: our crews install, protect with TMAs and log inspections.

  6. 06

    Revision

    Drawings updated as the works or the authority's conditions change.

2 to 3 daysSingle-closure TDP, from site survey and programme
1 to 2 weeksMulti-phase corridor TMP
2 daysResponses to authority comments

Authority review periods vary and are outside our control. We track each submission and tell you where it stands.

Good questions. Clear answers.

TMP and TDP questions

Something else? Speak with an engineer.

WhatsApp Riyadh
What is the difference between a TMP and a TDP?

The TMP is the overall plan: objectives, phasing, risks, stakeholders, emergency access and monitoring. The TDP, called a TTCP in Riyadh, is the set of drawings showing where each sign, cone, barrier and taper goes in each phase. Most authorities want both.

Who approves traffic diversion plans in Riyadh?

Infrastructure works in the Riyadh region are permitted through the Riyadh Infrastructure Projects Center (RIPC), which requires a traffic management plan and a temporary traffic control plan with the permit application.

Which standard does a traffic diversion plan in Saudi Arabia follow?

The Saudi Highway Code requirements for work zones and traffic control devices, plus the RIPC Infrastructure Projects Code in Riyadh and any project-owner rules, such as Aramco or RCRC requirements.

How long does it take to prepare a traffic diversion plan?

A single-closure TDP takes 2 to 3 working days once we have the site survey and programme. A multi-phase corridor TMP takes 1 to 2 weeks.

What is a TTCP in Riyadh?

A temporary traffic control plan (TTCP) is the drawing set RIPC requires with a work permit in Riyadh. It shows each closure, taper, sign and device for every phase. Elsewhere it is usually called a traffic diversion plan (TDP).

Can TCM implement the plan on site as well?

Yes. We supply the devices, install and maintain the layout, and provide TMA and IPV protection with our own crews.

Do you prepare TDPs for Ashghal submissions in Qatar?

Yes. Our Doha team prepares TDPs to the Ashghal Work Zone Traffic Management Guide and the Qatar Traffic Control Manual and manages the submission through to approval.

Start a conversation

Ready to move your project forward?

Send the site location and your programme. We come back with scope, price and earliest start, within one working day.

One engineer.
One accountable contact.

Request a proposal

Fields marked * are required.

0 / 2,000

Your request is submitted securely. An engineer will reply within one working day.

Request a proposal
Riyadh · Doha

Choose your local team

RiyadhSaudi Arabia+966 50 306 4427DohaQatar+974 7043 1546